As of 8 Feb 09

Project       Electrical Department In-house Training
Client         JGC Indonesia (Former PFN Pertafenikki)
Period        Apr 04 - Present
Job             To teach Electrical Calculations to Electrical Engineers in JGC Indonesia

Project       Balongan Revamping RCC Unit II
Client         Pertamina
Employer   JGC Indonesia (Former PFN Pertafenikki)
Status        Principle Electrical Engineer
Period        Nov ‘07 –Jan '09
Location    Jakarta Indonesia
Job             Electrical Engineering Quality control for equipment specifications and detail construction
design.

Project       Tangguh LNG Phase II Pre-Feed
Client         BP and BP Migas
Employer   JGC Indonesia (Former PFN Pertafenikki)
Status        Electrical Lead Engineer
Period        Sept 07–Oct 07
Location    Jakarta Indonesia
Job             Prepared Electrical Documents for Tangguh LNG Phase II Pre-Feed.

Project       Tangguh LNG
Client         BP and BP Migas
Employer   PFN Pertafenikki
Status        Principle Electrical Engineer
Period        Aug 05–Aug 06
Location    Jakarta Indonesia
Job             Conceptual design for earthing, and hazardous area classification.  
 Vendor document review,
 System calculation.
 Protection relay coordination.
 Cabling block diagram.

Project      BCD (Betara Complex Developtment )
Client        Petro China  
Employer  Chiyoda Corporation/
IKPT Joint venture
Status       Electrical Engineer
Period       Mar 03 – Mar 04
Location    Jakarta Indonesia
Job             Supervised and verified detail electrical engineering for whole plant such as;
 Grounding concept,
 Hazardous area classification concept,
 Lighting system concept,
 Cabling layout,
 Elementary diagram,
 Cable schedules,
 Connection schedules,
 Instrument interface list,

Project       ECS (Electrical Control System) Staff Training
Client         PT Badak  
Employer   PT Anis International
Status        Electrical Engineer
Period        Jun 03 – Aug 02
Location    Jakarta Indonesia
Job             Instructed to staff of PT Badak  LNG on subjects related to ECS, such as;
 Switchgear control,
 Generator Voltage control,
 Frequency control,
 Real power control,
 Reactive power control,
 Cross current compensation,
 Synchronizing technique
 Maintenance,
 How to trace Schematic Diagrams

Project       Electrical Panel Design for PGR (LNG) project
Client         PT Badak  
Employer   Yokogawa Electric Singapore
Status        Electrical Engineer
Period        Feb 00 – Jul 02
Location    Jakarta / Bontang Indonesia
Job             In Jakarta
 Person in charge on engineering work for ECS (Electrical Control System) for                   Bontang LNG
plant. ECS is a remote control system for generators and switchgears
 The work included:
 Conceptual design
 Detail design
 Material selection
 Factory test

at Bontang (Indonesia site)
 Prepared documentation such as
 Cutover procedures
 Field test procedures
 Supervised  ECS system installation such as;
 Hot and cold cutover
 Field modification on switchgear
 Field test.   

Project       Electrical Design for PGH (LNG) project
Client         Pertamina  
Employer   IKPT-Kellogg Joint venture
Status        Electrical Engineer
Period        Oct 97 – Nov 99
Location    Jakarta / Bontang Indonesia
Job             In Jakarta
 Supervised and verified detail electrical engineering for whole plant such as;
 Cabling layout,
 Elementary diagram,
 Cable schedules,
 Connection schedules,
 Instrument interface list,
 Bulk material specification,
 Hook up drawings, etc.
 Verified vendor electrical documents from all electrical and non-electrical group.
 Collected and updated all major and miscellaneous loads and interface.
                 
At Bontang (Indonesia site);
 Assigned as Electrical QC Engineer, to verify all electrical field acceptance test records to   energize
substations, also assisting local staff for all testing activities and trouble shooting.
                  
Project       Electrical Design for PGG (LNG) project
Client         Pertamina  
Employer   IKPT-Chiyoda  Joint venture
Status        Electrical Engineer
Period        Mar 95 – Oct 97
Location    Jakarta / Bontang Insonesia
Job             In Jakarta
 Supervised detail electrical engineering for whole plant, verified vendor documents from all non-
electrical group and all switchgear interface, collected all major and miscellaneous loads and interface,
prepared all elementary diagrams and wiring diagrams, prepared all cable schedules and drum
schedules.
                 
At Bontang (Indonesia site);
 Technical advising for construction and controlling testing documentation for mechanical completion of
the plant.
         
Project       Electrical design for QGL (LNG) project
Client         QatarGas
Employer   Chiyoda  Corporation
Status        Electrical Engineer
Period        Feb 94 – Mar 95
Location    Yokohama Japan
Job             Collected all electrical loads from P&I D, layout, etc.  
 Then, designed, coordinated and drafted single line diagrams for whole plant based on ITB.

Project       Electrical design PGF(LNG) project
Client         Pertamina
Employer  Chiyoda  Corporation
Status        Electrical Engineer
Period        Jun 91 – Dec 93
Location    Jakarta / Bontang Indonesia
Job             Supervised detail electrical engineering for whole plant in Jakarta, also supervised
construction and testing until mechanical completion of the plant at site in Bontang Indonesia.

Project       Electrical and instrument design for bag-filters
Client         N/A
Employer   Daiki Engineering
Status        Instrument Engineer
Period        Nov 90 – Jun 91
Location    Osaka Japan
Job             Designed electrical components and control logics for newly developing bag-filters for
incineration plants.

Project       Electrical design
Client         Cosmo Oil
Employer   Chiyoda-Keiso  
Status        Electrical Engineer
Period        Sept 90 – Nov 90
Location    Yokkichi Japan
Job             Wiring design for process modification for oil         

Project       HDPE Project
Client         Exxon Texs
Employer   Mitsui- Engineering
Status        Electrical Engineer
Period        Jan 90 – Aug 90
Location    Baytown Huston
Job             Construction and testing electrical motor controls at site in Exxon plant in Baytown TX.        

Project       Electrical supervisor for PGE(LNG) project
Client         Pretamina
Employer  Chiyoda Corporation
Status        Electrical Engineer
Period        Jun 89 – Jan 90
Location    Bontang Indonesia
Job             Supervising testing electrical motor controls.

Project       Design and pre-commissioning for instrument logic for power plant in SAUDI ARABIA
Client         Hitachi Zosen
Employer   Matsuo Denso
Status        Instrument Engineer
Period        Apr 87 – May 89
Location    Osaka Japan / Kaiser Saudi Arabia
Job             Except BMS, designed open-loop control system for whole power plant including turbine
guide in Osaka JAPAN, and supervised testing and optimizing the same logic at site in Kaiser SAUDI
ARABIA.

Project       Electrical design for cement plant in UAE
Client         Hitachi Zosen
Employer   Matsuo Denso
Status        Electrical Engineer
Period        Jan 84 – Dec 86
Location    Osaka Japan
Job             Basic and detail design for electrical installation

Project       Electrical construction supervisor for cement plant in Iran
Client         Kawasaki Heavy Industry
Employer   Matsuo Denso
Status        Electrical Engineer
Period        Dec 82 – Dec 83
Location    Osaka Japan
Job             Kirkuk in Iraq

Project       Electrical design for substation in Middle East area
Client         Hitachi Ltd
Employer   Imoto Engineering
Status        Senior Electrical Draftsman
Period        Apr 79 – Sept 82
Location    Hitachi Japan
Job             Technical Drafting

Project       Central Post Office in Teheran Iran Construction
Client         Teheran Central Post Office
Employer   Daiichi Kogyo
Status        Senior Mechanical Draftsman
Period        Apr 77– Mar 79
Location    Tokyo Japan / Teheran Iran
Job             Design and installing dust extraction plant.

Project       Various
Client         JGC
Employer   Kyooritsu Sekkei
Status        Junior Mechanical Draftsman
Period        Apr 73– Mar 77
Location    Kamioka Yokohama Japan
Job             Equipment design for oil refinery plants
Job Experience Detail